Clinical Waste Composting facilities Due diligence, auditing Energy-from-Waste Facilities Environmental monitoring services Landfill Bilsthorpe Landfill site Carnaby Landfill Feasibility Study including Turbine for Landfill Gas Gremista Waste Management Facility and Landfill, Lerwick Mare Chicose Landfill Extension Environmental Impact Assessment (EIA) North East and North West UK Landfill Disposal Penton Hook Landfill Pillar Point Valley Landfill Strengthening Capacity in Waste Management, Bulgaria Strengthening Capacity in Waste Management, Romania Shakespeare Farm Planning Enquiry, Medway Zheijang Landfill Recycling Waste collection, transfer and disposal Waste strategy, procurement and policy
 

Carnaby Landfill Site Capping with complex gas system, Bridlington

MMB (Mott MacDonald Bentley) undertook construction for the capping works, for the Waste Recycling Group (WRG), in cells two and three of the landfill site.


The capping of the Landfill siteThe capping of the landfill site


The principal driver for the scheme was to reduce production of leachate and extract the methane gas via a gas abstraction system.





The scope of work included:

  • Re-grading and compacting of the final waste levels according to the Waste Management License and PPC Document
  • Excavating, transporting and placing of suitable soils
  • Deployment of a LLDPE geomembrane liner, a non-woven needle punched geocomposite drainage layer, and an anchor trench perimeter
  • Disconnecting and re-connecting of a complex gas pipe work system to ensure the Environment Agency’s prescribed low gas pressures were maintained